If you need to determine if a system is in development, test or production mode, you can check the category field in table T000 to base your logic.

If you need to determine if a system is in development, test or production mode, you can check the category field in table T000 to base your logic.
select single CCCATEGORY from T000 into T000-CCCATEGORY where mandt eq sy-mandt.
if not T000-CCCATEGORY eq 'P'.
  "do stuff for non-prd here
endif.