QUESTION POSED ON: 13 October 2005
Hi Sachin,
We have an SRM Server 5.0 installation, and we are looking to keep all material-related information on the R/3 side (MM module). The plan is to download the material information like material groups from R/3 and then set up processes to do the synchronization (R/3 being the material master). Is this doable?
Can this senario also be extended to make R/3 the source for the workflow information in a similar way?
Greetings,
John
|