Can I upgrade from 4.0b to ECC 6.0? Is it possible, or do I have to upgrade to 4.6 first and then to ECC 6.0?

    Requires Free Membership to View

To my knowledge you should be able to upgrade to ECC 6.0 in one step. This is stated in the SAP ERP Central Component 6.0 ABAP Upgrade Guide.

This was first published in October 2007

Join the conversationComment

Share
Comments

    Results

    Contribute to the conversation

    All fields are required. Comments will appear at the bottom of the article.