We have up to six separate R/3 instants. Can STANDARD APO functionality be used for generating a constraint distribution requirements planning that take into considerations of capacity and availability of inventory across all the different resources (machines, inventory etc) in the different R/3 box?
Requires Free Membership to View
When you register, you will start receiving targeted emails from my award-winning team of editorial writers. Our goal is to keep you informed on the hottest topics and biggest challenges faced by SAP professionals today.
Hannah Smalltree, Editorial DirectorYes, standard Supply Network Planning (SNP) within APO can achieve this, although a lot of thought needs to go into the design and set-up of the system and data. The main aspect of achieving the single distribution plan would be to have one APO instance that connects with your six separate R/3 systems. Within SNP, one option would be to use Capable to Match (CTM) which creates a feasible multi-site solution based on the available stock, production capacities and transportation capabilities.
This was first published in December 2002